You are here: Home / Solutions / Solutions / ASRS Warehouse Solution for High-Density Automated Storage

ASRS Warehouse Solution for High-Density Automated Storage

Views: 0     Author: Site Editor     Publish Time: 2026-08-26      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Customer Pain Points

title.jpg

· High labor costs

Manual storage and retrieval operations require large workforces, with labor costs rising year over year.

· Insufficient storage capacity

Traditional flat warehouses utilize only 30-40% of available vertical space, limiting storage density.

· Low throughput efficiency

Manual handling creates bottlenecks during peak periods, restricting inbound/outbound throughput.

· Inventory inaccuracy

Manual recording leads to stock discrepancies, affecting production scheduling and order fulfillment.

· Safety risks

Forklift operations in narrow aisles increase accident probability and product damage rates.

Recommended System Architecture

title.jpg

The ASRS solution integrates the following subsystems into a cohesive automated warehouse:

· High-Precision Rack Structure

Cold-formed steel rack system engineered via finite element analysis (FEA), supporting loads up to 6,500 kg per unit, with heights reaching 34 meters.

· Stacker Crane / Shuttle System

Rail-guided stacker cranes with operating speeds up to 240 m/min, or four-way shuttle systems for multi-depth storage, enabling continuous operation up to 23.5 hours per day.

· Conveyor & RGV System

Roller/belt conveyors and rail-guided vehicles for automated inbound/outbound goods transport, with sorting rates exceeding 1,200 items per hour.

· WMS/WCS Software

Warehouse Management System and Warehouse Control System for real-time inventory tracking, task allocation, and equipment scheduling, achieving inventory accuracy of 99.9%+.

· Electrical Control System

PLC-based control architecture with safety interlocks, barcode/RFID identification, and seamless ERP/MES integration.

Solution Benefits

title.jpg

· Space Utilization

By optimizing the ratio of vertical storage height to footprint, space utilization can exceed 80%-far surpassing the 30-40% typical of conventional flat warehouses.

· Throughput Efficiency

Hourly inbound and outbound operational efficiency is 3-5 times higher than manual operations, significantly reducing order processing times.

· Inventory Accuracy

Leveraging WMS and real-time tracking via barcode or RFID, inventory accuracy remains consistently above 99.9%, virtually eliminating errors and omissions.

· Labor Reduction

Replacing manual handling with automated storage and retrieval reduces warehouse staffing requirements by over 60%, effectively alleviating labor shortages.

· Operational Hours

The system supports up to 23.5 hours of continuous daily operation, enabling near 24/7 functionality.

· Storage Capacity

Single-project pallet capacity can exceed 110,000 positions (e.g., the China Resources Beverage project), meeting large-scale storage demands.

· ROI Period

Through labor savings and increased productivity, the return on investment (ROI) for medium-to-large projects typically ranges from 3 to 5 years, offering significant economic value.

Applicable Industries

title.jpg

· Food & Beverage

Raw material storage, finished goods warehousing, cold chain integration

· Pharmaceutical

GMP-compliant storage with full traceability and temperature control

· Automotive

Parts distribution centers, JIT line-side supply, work-in-process buffer

· Electronics & Electrical

Component storage with ESD protection, high-SKU management

· New Energy

Battery materials, electrode storage, hazardous goods management

· Third-Party Logistics (3PL)

Multi-client warehousing with flexible allocation

· Cold Chain

Cold storage ASRS with low-temperature shuttles and insulated structures

Related Products

title.jpg
1-ASRS-Warehouse-Solution

Stacker Cranes (single/double column, turning type)

Four-Way Shuttles (hydraulic, mechanical, cold-storage versions)

Conveyor Systems (roller, belt, chain)

WMS / WCS Software

High-Precision ASRS Rack Structures

Case Studies

title.jpg

China Resources Beverage Modern Logistics Warehouse

Shuttle-based ASRS with a design capacity of 110,000+ pallet positions, integrating WMS/WCS for real-time inventory management. The system enables high-density storage for beverage products while maintaining FIFO compliance and rapid order fulfillment.

Jabil Electronics (Fortune 500) Component Storage

Stacker crane ASRS with maximum running speed of 240 m/min, supporting continuous operation of 23.5 hours per day. The system handles high-frequency component retrieval for electronics manufacturing with 99.9%+ inventory accuracy.

Pak Smart Warehouse

ASRS project with a vertical construction height of 34 meters - the tallest single-unit intelligent warehouse in its industry segment - maximizing land utilization for lighting product storage.

FAQ

title.jpg

Q: What information is required for ASRS layout design?

A: Warehouse dimensions (length, width, clear height), pallet size and weight, number of SKUs, daily inbound/outbound volume, storage strategy (FIFO/LIFO/batch), and any integration requirements with existing WMS/ERP/MES systems.

Q: Can the ASRS connect with our existing WMS or ERP?

A: Yes. SUNLI's WCS supports standard interfaces (API, XML, database-level) for seamless integration with mainstream WMS, ERP, and MES platforms, enabling real-time data synchronization.

Q: What is the typical project timeline from design to commissioning?

A: For a standard ASRS project, the timeline is approximately 4-8 months depending on system complexity, site conditions, and customization scope - covering planning, manufacturing, installation, commissioning, and acceptance testing.

Q: What after-sales support is provided?

A: SUNLI offers 24/7 remote support, on-site maintenance, spare parts supply, software upgrades, and system optimization throughout the system lifecycle.

ASRS Warehouse Solution

Send us your production layout, material flow diagram, and MES integration requirements for a customized manufacturing automation proposal.

An intelligent logistics integrated solution integrator&manufacturer
 

Quick Links

Contact Information

  Tangxia Village Industrial Zone, Gaobo Town, Dongguan City
 +86-17666203625
 +86-17666203625
   sales168@dgsunli.com
Keep In Touch With Us
​Copyright © 2023 Guangdong Sunli Intelligent Logistics Equipment Co., Ltd. All rights reserved    Sitemap | Supported By Leadong   Privacy Policy